I noticed that my feeder cable from my sub panel to my main panel is just laying on some of the plumbing, not really attached to the floor joists. We have a final inspection scheduled for Monday and I told him we should cancel it considering there is still MEP work that needs to be done. He says its fine and it will pass final. Am I crazy to think that this work should be done before final inspection? He also said that I don’t have a right to stop the inspection even though my opinion differs from their idea of “substantial completion.”

Also to add the icing on the cake, I was naive and already paid the invoice he sent for MEP even though there is this issue with the power along with outlets not working, there is still some stuff like the sewer cleanout that needs to be done, and the air conditioning is not working…

  • worhui@lemmy.world
    link
    fedilink
    arrow-up
    0
    ·
    1 day ago

    That electrical wire should absolutely be secured. That is all sorts of wrong. Make them fix it first, you may need to pay for a separate electrical inspection.

    I can’t imagine there aren’t a bunch of other things done negligently . This looks all sorts of wrong.

    I didn’t even notice that at first, the pipe in the foreground got my attention. I don’t understand the strapping and netting around the plumbing. It looks incorrectly installed.

    Once the papers are signed , the problem and cost of repair will fall on you.